The Ouse Washes have seen some of the deepest and most sustained flooding, with a 3.7m depth recorded on three occasions - this may however benefit the washes by scouring the river bed and reducing the risk of summer flooding of ground nesting birds.
Another flooding issue has arisen at Dogsthorpe Star Pit, where unfortunately once again our pump has failed, and the pit floor lake has expanded flooding into the grassland and some ponds. The water levels are now so high that an additional larger pump needs to be hired in before we can install a replacement pump.
Coppicing work continued at Brampton Wood during the winter months, including some wood extraction. Extraction work is to continue once the ground has dried out.